Include the building name, tenancy or level, suburb and approximate area, together with wide and close photographs. Explain whether the space is vacant, whether floor coverings remain and what finish is intended. A floor plan can help show separated rooms and the length of the access route.
Ask the building manager about permitted work periods, induction, loading arrangements and protection of common areas, then share the answers. Superfloor can consider the job against those actual conditions. Working at night, completing a tenancy in one visit or using a particular lift is not promised before that information is assessed.
For another nearby project, compare East Brisbane’s renovation guide and Carindale polished concrete. The Brisbane coverage hub links the available local guides, while our contact page is the place to send your own building and floor details.