02 · Establish the site
What should you confirm before a Sunshine Coast visit?
Include the street address in Maroochydore, Mooloolaba, Caloundra, Nambour, Kawana or the locality where the floor is located. Superfloor’s public base is Brisbane; discuss travel and scheduling for that address. The regional name alone does not confirm project coverage or a local office.
For a shared building or fit-out
Record loading arrangements, lift size and the route to the tenancy. Ask management about noisy work, protection of shared areas and access while neighbouring premises remain occupied. Include the person who can authorise the building arrangements, plus photographs of doorways and corners equipment must pass.
For a house or outdoor area
Show the path from unloading to the slab, including gates, changes in level and narrow passages. Identify where extraction equipment can stand and what must be cleared. For a patio or pool surround, photograph falls, drains and the edge beside other finishes rather than sending only a close-up of the surface.
If loading, material storage or a construction zone will occupy a road, verge or footpath, check the Council temporary works permit guidance before scheduling. Keep public access separate from the private work area and confirm the proposed arrangement with Council.